Mines Videos Website Mine$tock Article News Our Videos




Latest News Release -
V.LME

(TheNewswire)

Laurion Mineral Exploration Inc.

TORONTO, Ontario — October 29, 2026 - TheNewswire — LAURION Mineral Exploration Inc. (TSX-V: LME | OTC: LMEFF | FSE: 5YD) (“LAURION& or the “Company&) is pleased to report assay results from drill holes LBX26-113, LBX26-114A, LBX26-115, LBX26-116, LBX26-117 and LBX26-121, from its 2026 Phase 1 diamond drilling program at its 100%-owned Ishkoday Gold and Polymetallic Project (“Ishkoday Project&), located approximately 220 km northeast of Thunder Bay and 28 km northeast of Beardmore, Northwestern Ontario.

Building on the drilling program to date, LAURION increased its planned Phase 1 drilling from 3,865 metres to 5,605 metres across 22 drill holes. The expanded program is being informed by SRK Consulting&s independent structural gap analysis of the A-Zone, which identified five priority target areas where additional drilling may address key gaps in the existing drill database and further strengthen the geological understanding of the A-Zone. LAURION is using this framework, together with ongoing drill results, to prioritize near-term drilling as it continues to systematically advance its exploration of the A-Zone, with the objective of validating its geological interpretation and supporting the evaluation of a potential maiden Mineral Resource Estimate (“MRE&). Additional targets, sequencing and timing remain subject to, among other things, ongoing results and available financing.

Cynthia Le Sueur-Aquin, President and CEO, commented: “LBX26-117 returned 1.80 metres grading 17.10 g/t gold, including 0.80 metres at 31.50 g/t gold, together with a broader 10.05-metre interval of gold-bearing polymetallic mineralization deeper in the hole. LBX26-121, drilled from the same collar at a shallower angle, intersected gold at several levels, including 5.20 metres grading 1.067 g/t gold with 1.11% zinc, and LBX26-116 returned 2.80 metres grading 2.261 g/t gold. This drilling is designed to address the specific gaps identified by SRK Consulting, improve our understanding of the continuity and geometry of mineralization between drill holes, and build a reliable technical foundation at the A-Zone. We will continue to let the data guide our next steps.&

Highlights of Assays Are as Follows:

LBX26-117 – A-Zone

  • 1.80 m grading17.100 g/t Au, 9.24 g/t Ag (91.50–93.30 m), including 0.80 m grading 31.500 g/t Au and 15.60 g/t Ag (92.00–92.80 m).

  • 3.70 m grading 0.927 g/t Au, 2.10 g/t Ag and 0.29% Zn (127.50–131.20 m), including 1.10 m grading 2.623 g/t Au and 2.85 g/t Ag (128.90–130.00 m).

  • 10.05 m grading 1.112 g/t Au, 2.12 g/t Ag and 0.51% Zn (160.25–170.30 m), including 1.85 m grading 4.107 g/t Au, 8.23 g/t Ag,0.23% Cu and 2.19% Zn (160.25–162.10 m), including 0.60 m grading 9.500 g/t Au, 19.10 g/t Ag, 0.49% Cu and 3.79% Zn (160.90–161.50 m).

LBX26-116 – A-Zone

  • 2.80 m grading 2.261 g/t Au, 8.06 g/t Ag, 0.15% Cu and 0.10% Zn (134.00-136.80m), including 0.80 m grading 6.510 g/t Au, 21.50 g/t Ag, 0.43% Cu and 0.24% Zn (134.75-135.55m).

  • 20.05 m grading 0.411 g/t Au, 3.76 g/t Ag and 0.61% Zn (162.40-182.45m), including 7.90 m grading 0.730 g/t Au, 4.88 g/t Ag and 0.86% Zn (167.50-175.40m), including 0.50 m grading 3.050 g/t Au, 56.50 g/t Ag, 0.14% Cu and 4.89% Zn (172.85-173.35m).

LBX26-115 – A-Zone

  • 4.35 m grading 0.820 g/t Au, 9.65 g/t Ag and 0.66% Zn (37.20–41.55 m), including 1.30 m grading 2.356 g/t Au, 27.11 g/t Ag, 0.23% Cu and 2.06% Zn (38.10–39.40 m).

  • 1.10 m grading 1.218 g/t Au, 3.30 g/t Ag and 0.86% Zn (47.10–48.20 m).

LBX26-121 – A-Zone

  • 5.20 m grading 1.067 g/t Au, 7.87 g/t Ag and 1.11% Zn (133.00–138.20 m), including 1.05 m grading 3.467 g/t Au, 18.93 g/t Ag and 3.60% Zn (135.05–136.10 m).

  • 0.65 m grading 6.240 g/t Au and 5.60 g/t Ag (192.85–193.50 m).

Drilling Objectives

Six holes totalling 1,227 m are discussed in this release. This figure is not the total 2026 program metreage.

Actual Hole ID

Easting

Northing

Azimuth

Dip

Final Length

(m)

LBX26-113

446625

5513190

125.60°

−75.12°

129

LBX26-114A

446615

5513190

135.34°

−60.04°

159

LBX26-115

446597

5513165

128.20°

−45.26°

153

LBX26-116

446329

5512704

112.00°

−72.00°

279

LBX26-117

446281

5512621

110.00°

−67.00°

306

LBX26-121

446281

5512621

110.00°

−45.00°

201

Total

1,227

LBX26-113 – Interpretation

LBX26-113 was designed as a twin of historical hole 92-65 to verify previously reported high-grade gold and polymetallic mineralization. The new assays returned lower grades than the historical results. The Company will evaluate the implications for the historical drill database for this hole and their geological interpretation.

Hole ID

From

(m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-113

28.00

30.00

2.00

0.234

0.39

0.01

0.01

LBX26-113

42.00

44.50

2.50

0.191

3.96

0.03

0.32

including

42.50

43.00

0.50

0.460

13.00

0.09

1.27

LBX26-113

52.50

54.50

2.00

0.450

4.45

0.04

0.25

including

52.50

53.50

1.00

0.624

8.10

0.08

0.46

LBX26-113

58.80

60.10

1.30

0.348

0.55

0.01

0.23

LBX26-113

64.00

68.00

4.00

0.321

0.51

0.01

0.32

including

67.30

68.00

0.70

1.320

1.00

0.01

0.74

LBX26-113

88.50

89.00

0.50

0.412

0.25

0.01

0.03

LBX26-113

116.80

117.30

0.50

0.481

5.40

0.10

1.66

LBX26-114A and LBX26-115 – A-Zone

Targeted infill drilling designed to address identified gaps in the existing drill database and refine interpretations of mineralization between earlier intersections. LBX26-114A replaced LBX26-114 after it was abandoned due to an orientation issue.

Hole ID

From (m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-114A

21.50

22.00

0.50

0.547

1.80

0.01

0.01

LBX26-114A

34.50

44.50

10.00

0.194

3.43

0.02

0.15

including

34.50

35.20

0.70

0.588

16.80

0.08

0.89

LBX26-114A

50.00

55.00

5.00

0.188

1.54

0.02

0.36

including

53.30

54.50

1.20

0.203

2.01

0.04

1.11

LBX26-114A

62.00

62.50

0.50

0.116

0.25

0.01

0.05

LBX26-114A

65.90

67.30

1.40

0.273

1.46

0.02

0.34

including

66.80

67.30

0.50

0.512

2.10

0.03

0.74

LBX26-114A

69.00

70.00

1.00

0.158

0.25

—

0.02

LBX26-114A

78.00

79.50

1.50

0.341

0.25

0.01

0.59

including

78.50

79.00

0.50

0.522

0.25

0.01

1.36

LBX26-114A

94.00

95.50

1.50

0.122

0.25

—

0.03

LBX26-114A

100.50

102.00

1.50

0.112

0.25

—

0.02

LBX26-114A

105.00

105.50

0.50

0.109

0.25

—

0.02

LBX26-114A

111.50

113.00

1.50

0.788

0.88

0.02

0.15

including

111.50

112.00

0.50

1.215

1.80

0.04

0.36

LBX26-114A

119.60

120.10

0.50

0.331

0.25

—

0.02

LBX26-114A

133.60

134.50

0.90

0.136

0.25

—

0.02

LBX26-114A

144.00

144.50

0.50

0.126

0.90

0.03

0.08

LBX26-114A

155.80

157.00

1.20

0.295

1.58

0.05

3.61

Hole ID

From (m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-115

37.20

41.55

4.35

0.820

9.65

0.08

0.66

including

38.10

39.40

1.30

2.356

27.11

0.23

2.06

LBX26-115

47.10

48.20

1.10

1.218

3.30

0.02

0.86

including

47.10

47.65

0.55

2.110

5.50

0.04

1.66

LBX26-115

49.60

52.50

2.90

0.385

1.82

0.02

0.30

LBX26-115

56.05

57.80

1.75

0.200

0.79

0.01

0.14

LBX26-115

65.00

67.30

2.30

0.237

0.65

0.01

0.13

including

66.80

67.30

0.50

0.636

1.60

0.02

0.32

LBX26-115

69.60

70.20

0.60

0.300

0.50

0.01

0.01

LBX26-115

71.00

72.00

1.00

0.131

0.60

—

0.02

LBX26-115

105.80

106.30

0.50

0.191

1.50

0.01

0.03

LBX26-115

110.90

112.50

1.60

0.293

0.68

—

0.01

LBX26-115

115.80

116.50

0.70

0.149

0.25

—

0.03

LBX26-115

130.00

131.20

1.20

0.173

0.25

—

0.01

LBX26-116 and LBX26-117 – A-Zone

Targeted additional drill coverage to improve understanding of mineralized horizons, their geometry and possible continuity.

Hole ID

From (m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-116

16.10

16.60

0.50

0.203

0.25

0.01

0.01

LBX26-116

32.00

32.60

0.60

0.338

0.60

0.01

0.02

LBX26-116

89.00

90.00

1.00

0.497

0.25

0.01

0.01

LBX26-116

99.90

104.80

4.90

0.248

0.88

0.01

0.06

including

102.00

103.70

1.70

0.396

1.34

0.02

0.11

LBX26-116

108.00

110.10

2.10

0.122

2.31

0.05

1.12

including

109.60

110.10

0.50

0.399

6.70

0.10

3.84

LBX26-116

127.95

128.45

0.50

0.996

1.80

0.01

0.03

LBX26-116

129.80

130.30

0.50

0.722

3.80

0.07

0.11

LBX26-116

134.00

136.80

2.80

2.261

8.06

0.15

0.10

including

134.75

135.55

0.80

6.510

21.50

0.43

0.24

LBX26-116

141.30

141.8

0.50

0.243

0.80

0.01

0.03

LBX26-116

155.30

156.00

0.70

0.216

0.25

—

0.03

LBX26-116

162.40

182.45

20.05

0.411

3.76

0.02

0.61

including

167.50

175.40

7.90

0.730

4.88

0.02

0.86

including

172.85

173.35

0.50

3.050

56.50

0.14

4.89

LBX26-116

188.85

190.50

1.65

0.149

0.82

0.01

0.06

LBX26-116

202.00

203.50

1.50

0.269

0.25

0.01

0.03

LBX26-116

262.40

263.00

0.60

0.311

2.00

0.17

0.82

LBX26-116

271.50

273.00

1.50

1.025

0.80

—

0.04

Hole ID

From (m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-117

81.20

81.70

0.50

0.192

0.60

0.01

0.02

LBX26-117

84.90

85.50

0.60

0.264

1.50

0.03

0.05

LBX26-117

91.50

93.30

1.80

17.10

9.24

0.07

0.05

including

92.00

92.80

0.80

31.50

15.60

0.10

0.05

LBX26-117

94.80

97.40

2.60

0.154

1.84

0.02

0.03

LBX26-117

111.90

112.80

0.90

0.166

1.20

0.02

0.05

LBX26-117

125.50

126.30

0.80

0.142

0.80

0.03

0.32

LBX26-117

127.50

131.20

3.70

0.927

2.10

0.05

0.29

including

128.90

130.00

1.10

2.623

2.85

0.07

0.07

LBX26-117

133.00

133.75

0.75

0.139

0.60

-

0.01

LBX26-117

148.00

150.00

2.00

0.122

0.475

0.02

0.03

LBX26-117

160.25

170.30

10.05

1.112

2.12

0.05

0.51

including

160.25

162.10

1.85

4.107

8.23

0.23

2.19

including

160.90

161.50

0.60

9.500

19.10

0.49

3.79

LBX26-117

176.50

177.00

0.50

0.496

8.40

0.02

2.36

LBX26-117

181.80

182.80

1.00

0.127

1.20

0.06

0.10

LBX26-117

218.50

219.50

1.00

0.118

0.25

-

0.01

LBX26-121 – A-Zone

Drilled from the same collar location as LBX26-117 at a shallower planned dip, to examine a different portion of the subsurface sequence. Specific geological target remains to be confirmed.

Hole ID

From (m)

To

(m)

Length (m)

Au g/t

Ag g/t

Cu %

Zn %

LBX26-121

45.40

46.35

0.95

1.345

0.50

0.01

0.07

LBX26-121

58.80

59.80

1.00

0.323

0.25

-

0.01

LBX26-121

85.65

86.20

0.55

0.350

0.90

0.02

0.13

LBX26-121

112.95

115.00

2.05

0.154

1.20

0.02

0.13

LBX26-121

119.00

121.00

2.00

0.162

0.95

0.02

0.27

LBX26-121

124.00

127.40

3.40

0.173

0.90

0.01

0.21

including

126.80

127.40

0.60

0.529

2.40

0.01

0.88

LBX26-121

133.00

138.20

5.20

1.067

7.87

0.06

1.11

including

135.05

136.10

1.05

3.467

18.93

0.08

3.60

LBX26-121

149.40

149.90

0.50

8.980

14.00

0.01

0.07

LBX26-121

156.20

156.70

0.50

0.717

14.50

0.19

0.92

LBX26-121

160.60

161.30

0.70

0.220

1.20

0.01

0.03

LBX26-121

187.50

188.00

0.50

0.125

8.60

0.14

0.10

LBX26-121

192.85

193.50

0.65

6.240

5.60

0.01

0.02

Note: All core lengths are drilled thicknesses; true widths have not yet been determined. Intervals are calculated using a nominal cut-off and may include internal dilution; “including& intervals are sub-intervals of higher grade contained within the reported interval.

Sampling and QA/QC Protocols

All drill core is transported and stored inside the core logging facility located at the Ishkoday Project in Greenstone, Ontario.

LAURION employs an industry standard system of external standards, blanks and duplicates for all of its sampling, in addition to the QA/QC protocol employed by the laboratory. After logging, core samples were identified and then cut in half along the core axis in the same building and then zip tied individually in plastic sample bags with a bar code. Approximately five or six of these individual bags were then stacked into a “rice& white material bag and stored on a skid for final shipment to the laboratory. All core samples were shipped to the ALS Global Geochemistry facility in Thunder Bay, Ontario, where they were prepared, and the resulting pulps were analyzed by ALS Global Analytical Lab in North Vancouver, British Columbia. ALS is independent of LAURION. Samples are processed by 4-acid digestion and analyzed by fire assay on 50 g pulps and ICP-AES (Inductively Coupled Plasma – Atomic Emission Spectroscopy).

Over limit analyses are reprocessed with gravimetric finish. A total of 5% blanks and 5% standards are inserted randomly within all samples. 5% of the best assay result pulps were sent for re-assays. All QA/QC results were verified, and no contamination or bias was observed. The remaining half of the core, as well as the unsampled core, is stored in temporary core racks at the core logging facility in Greenstone before being moved to the core storage facility at the Ishkoday Project.

QA/QC review of standards and duplicates indicates analytical results are reliable. One zinc standard adjacent to a high-grade zinc interval returned elevated values consistent with expected analytical behaviour following high-grade samples.

Qualified Person

The technical contents of this press release have been reviewed and approved by Dr. Trevor Boyd, Ph.D., P.Geo., a consultant to LAURION and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101&). Dr. Boyd is independent of the Company within the meaning of NI 43-101.

About LAURION

LAURION Mineral Exploration Inc. is a mid-stage Canadian mineral exploration company, focused on advancing the 100%-owned Ishkoday Gold and Polymetallic Project in Northern Ontario.

The Ishkoday Project covers approximately 57 km² within the Beardmore–Geraldton and Onaman–Tashota Greenstone Belts and hosts a single 6.0 km by 2.5 km mineralized corridor. Historical and modern exploration programs have completed over 100,000 metres of drilling, confirming a large and evolving gold-rich polymetallic mineral system.

LAURION&s strategy emphasizes disciplined, data-driven exploration, systematic technical advancement, integrated geological modelling, and responsible capital allocation. The Company is focused on strengthening geological confidence, expanding the scale of the mineral system, and positioning the project for a potential future MRE.

LAURION continues to evaluate opportunities that may enhance project development flexibility, including potential non-dilutive initiatives such as the evaluation of historical surface stockpile processing. The Company&s objective is to build technical clarity, scale, and long-term project value before monetization, with the aim that future development decisions or strategic opportunities are supported by strong geological foundations and reduced execution risk.

Cynthia Le Sueur-Aquin, President and CEO of LAURION, is the Company&s largest shareholder, holding 17,221,306 common shares, reflecting strong alignment between management and shareholders.

For Further Information, Contact:

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186 Fax: 1-705-805-9256

Douglas Vass - Investor Relations Consultant

Email: [email protected]

Website: http://www.LAURION.ca

Follow us on: X (@LAURION_LME), Instagram (laurionmineral) and LinkedIn

Caution Regarding Forward-Looking Information:

This press release contains forward-looking statements, which reflect the Company&s current expectations regarding future events including with respect to LAURION&s business, operations and condition, management&s objectives, strategies, beliefs and intentions, the Company&s ability to advance the Ishkoday Project and achieve the Company&s strategic and technical objectives (within the above-stated timeframes, if at all), including with respect to the Company&s expectations regarding the MRE, the nature, focus, timing and potential results of the Company&s exploration, drilling and prospecting activities, including the Company&s exploration program and planned exploration and drilling activities referenced in this press release, and the statements regarding the Company&s exploration or consideration of any possible strategic alternatives and transactional opportunities, as well as the potential outcome(s) of this process, the possible impact of any potential transactions referenced herein on the Company or any of its stakeholders, and the ability of the Company to identify and complete any potential acquisitions, mergers, financings or other transactions referenced herein, and the timing of any such transactions.

The forward-looking statements involve risks and uncertainties. Actual events and future results, performance or achievements expressed or implied by such forward-looking statements could differ materially from those projected herein including as a result of a change in the trading price of the common shares of LAURION, the failure to obtain the consents, permits and/or approvals from applicable governmental bodies, regulators and First Nations communities, required in connection with the Company&s strategic and technical objectives, the risk that additional drilling and/or future results may not support the preparation of an MRE, the TSX Venture Exchange or any other applicable regulator not providing its approval for any strategic alternatives or transactional opportunities, the interpretation and actual results of current exploration activities, changes in project parameters as plans continue to be refined, future prices of gold and/or other metals, possible variations in grade or recovery rates, failure of equipment or processes to operate as anticipated, the failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the Company&s publicly filed documents. Investors should consult the Company&s ongoing quarterly and annual filings, as well as any other additional documentation comprising the Company&s public disclosure record, for additional information on risks and uncertainties relating to these forward-looking statements. The reader is cautioned not to rely on these forward-looking statements. Subject to applicable law, the Company disclaims any obligation to update these forward-looking statements. Readers are cautioned to not place undue reliance on the assay values reported in this press release. References to historical workings, historical exploration results and historical mining activities are provided for context only. Historical information may not be reliable and should not be interpreted as an indication of current mineral resources, mineral reserves or future exploration results.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Copyright (c) 2026 TheNewswire - All rights reserved.

Investment Disclosure



Some of the companies on this website and in our videos are paying clients of Mine$tockers Inc., and where that is the case the information is disseminated on behalf of that company. A listing on this site does not by itself indicate a client relationship - many of the companies we cover have no commercial relationship with us and are featured only because we follow them as retail investors. Mine$tockers and its employees may own or purchase a company's securities from time to time. Mine$tockers Inc.is neither an investment adviser nor a broker-dealer and accordingly is not registered as an investment adviser or a broker-dealer under applicable law. The Mine$tockers website provides readers with general, non-personalized information regarding private and publicly traded companies and why we may have become retail investors. The content provided on this website and in Mine$tockers episodes is for informational purposes only and should not be considered as an offer, solicitation, recommendation, or determination by Mine$tockers Inc. for the sale of any financial product or service or the suitability of an investment strategy for any investor.

Investors are advised to consult a financial professional to determine the appropriateness of an investment strategy based on their objectives, financial situation, investment horizon, and individual needs. This information is not intended to serve as financial, tax, legal, accounting, or other professional advice, as such advice should always be tailored to individual circumstances.

The products discussed herein are not insured by any government agency and carry risks, including the potential loss of the principal amount invested. Any information provided is based on both internal and external sources and should not be construed as an endorsement or conclusion regarding a company's financial prospects, resources, or management. Opinions expressed may change and should not be relied upon. It is crucial to seek personalized investment advice for your unique situation.

Natural resources investments are generally volatile, with higher headline risk than other sectors. They tend to be more sensitive to economic data, political and regulatory events, and underlying commodity prices. The prices of natural resources investments are influenced by factors such as the costs of underlying commodities like oil, gas, metals, and coal. These investments may trade on various exchanges and experience price fluctuations due to short-term demand, supply, and investment flows.

Natural resource investments often respond more sensitively to global events and economic data, including natural disasters, political turmoil, pandemics, or the release of employment data.

Investing in foreign markets may carry greater risks than domestic markets, including political, currency, economic, and market risks. It is essential to evaluate if trading in low-priced and international securities is appropriate for your circumstances and financial resources. Past performance does not guarantee future results.

Mine$tockers Inc., its affiliates, family, friends, employees, associates, and others may hold positions in the securities it covers. Some of the companies covered may be paying clients of the production.

No investment process is risk-free, and profitability is not guaranteed; investors may lose their entire investment. No investment strategy or risk management technique can guarantee returns or eliminate risk in any market environment. Diversification does not ensure a profit or protect against loss. Investing in foreign securities involves risks not associated with domestic investments, such as currency fluctuations, political and economic instability, and differing accounting standards, potentially leading to greater share price volatility. The prices of small- and mid-cap company stocks generally experience higher volatility than large-company stocks and may involve higher risks. Smaller companies may lack the management expertise, financial resources, product diversification, and competitive strengths needed to withstand adverse economic conditions.

logo

Studio


Toronto Ontario Canada

Email


kevin@MineStockers.com

Phone


+1 (905) 967-2519