Latest News Release -
T.OGC

VANCOUVER, BC, Sept. 11, 2025 /PRNewswire/ - OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) ("OceanaGold" or the "Company") is pleased to announce positive results from its exploration and resource conversion drilling programs at the Haile Gold Mine ("Haile") in the United States.

Gerard Bond, President and CEO of OceanaGold, said "With a record high exploration budget of $10 million at Haile this year, we are delighted by the excellent return on investment we continue to generate through exploration. These exciting results continue to demonstrate the continuity of high-grade mineralization at several deposits across the property, notably at Ledbetter Phase 4, Horseshoe Underground, and the promising new early-stage Pisces and Clydesdale targets. The exploration success continues to highlight the exceptional upside for low-risk organic growth we have within our existing portfolio of assets."

Drilling Highlights (core length):

Ledbetter Phase 4 (conversion drilling)

  • 28.9 m @ 18.33 g/t Au (DDH1279)
  • 8.7 m @ 22.30 g/t Au (DDH1281)

Horseshoe (conversion drilling)

  • 16.1 m @ 16.33 g/t Au (UGD0082)
  • 14.6 m @ 10.33 g/t Au (UGD0084)
  • 24.0 m @ 7.99 g/t Au (UGD0085)
  • 22.0 m @ 8.60 g/t Au (UGD0086)
  • 10.2 m @ 11.12 g/t Au (UGD0084)

Pisces (Initial drilling, located 300 m south of Horseshoe)

  • 7.6 m @ 10.39 g/t Au (DDH1271)
  • 6.6 m @ 3.34 g/t Au (DDH1290)

Clydesdale(initial drilling, located 100 m northwest of Palomino)

  • 26.2 m @ 4.11 g/t Au (DDH1282)

Results can be viewed in 3D using VRIFY at the following link:

https://vrify.com/meetings/recordings/c880f1e8-449e-41a1-916c-125c8df72661

VRIFY note: Drill results reflect only those set forth in OceanaGold's press release dated September 11, 2025, and do not include all historical drill results except those relevant to the current targets in this release.

Ledbetter Phase 4 – High-Grade Results Targeting Underground Resource Conversion

Mineralization in Ledbetter Phase 4 is located within the current final phase of the open pit Mineral Reserve (Figure 1). An ongoing resource conversion drill program is enhancing resource confidence and providing samples for metallurgical testing in support of the current trade-off study for the evaluation of a potential underground mine at Ledbetter, which has potential for improved overall site economics.

A zone of mineralization, down-dip of Ledbetter Phase 4 extension, has been tested with a total of four holes, or 1,975 metres ("m"). The program has returned results with strong mineralized intersections: 28.9 m @ 18.33 g/t Au from 489.1 mincluding1.3 m @ 189.22 g/t (DDH1279), and 8.7 m @ 22.30 g/t Au from 375.9 mincluding5.0 m @ 35.86 g/t (DDH1281).

Figure 1: Schematic cross section (looking northeast) showing Ledbetter mineralization with recent drill holes annotated. (CNW Group/OceanaGold Corporation)

Horseshoe Underground – Support for Additional Resource Growth

At Horseshoe Underground, drilling continues on both resource conversion and definition programs, totalling 7,467 m from 24 holes since the February 2025 news release. Conversion drilling totalling 4,261 m in 14 holes has targeted Inferred Mineral Resources in the lower levels of the deposit. Notable intercepts include: 16.1 m @ 16.33 g/t Au from 274.3 m (UGD0082) and 14.6 m @ 10.33 g/t from 235.6 m (UGD0084), 24.0 m @ 7.99 g/t from 258.6 m (UGD0085) and 22.0 m @ 8.60 g/t from 259.3 m (UGD0086); the latter three holes extending high-grade mineralization to the southwest.

Definition drilling totalling 10 holes for 3,206 m has targeted step-out opportunities, primarily south and west of the current resource. Assay results for nine holes have been received with the following significant intercepts: 7.6 m @ 3.63 g/t Au from 271.0 m and 9.1 m @ 3.40 g/t Au from 299.9 m (UGD0097) and 5.0 m @ 5.64 g/t Au from 267.9 m (UGD0100). The definition drill program is ongoing with 2,600 m remaining to be drilled in 2025. These results demonstrate the potential for continued resource growth, and drilling will remain focused on further defining step-out targets to support future underground development.

Figure 2: Schematic long section (looking northwest) showing Horseshoe mineralization with recent significant intercepts annotated. (CNW Group/OceanaGold Corporation)

Pisces – Initial Drilling of High-Grade Target

The Pisces target is located along the prospective corridor between the Horseshoe and Palomino deposits at approximately 550 m below surface and close to existing and planned underground infrastructure.

A total of nine holes for 6,167 m has been drilled in 2025, with the testing of geological and grade continuity. Significant intercepts include: 7.6 m @ 10.39 g/t Au from 647.0 m (DDH1271), 6.8 m @ 2.60 g/t Au from 571.0 m (DDH1285) and 6.6 m @ 3.34 g/t Au (DDH1290), demonstrating continuity of mineralization in the eastern area of the target towards Horseshoe. See the VRIFY link for visual representation of the results.

In conjunction with previously reported results, 44.2 m @ 10.85 g/t Au from 591 m (DDH1267), 9.4 m @ 44.14 g/t Au from 686.1 m (DDH1269) and 42.7 m @ 6.07 g/t Au from 560.2 m (DDH1257), (released February 24, 2025), the highest-grade mineralization defines a 150 m strike length. This zone of higher-grade mineralization remains to be further tested, while the target remains open to the northeast towards Horseshoe and down-dip.

Clydesdale – Successful Early-Stage Result

The early-stage Clydesdale drill target is located 100 m northwest of Palomino and approximately 300 m stratigraphically lower at approximately 800 m below surface. The target is defined by anomalous gold grades in wall rock metasediments, anomalous pathfinder geochemistry, and alteration mineralogy (Table 2). A total of two holes totalling 1,600 m have been drilled in 2025 to test the target. Initial results have returned one significant intercept of 26.2 m @ 4.11 g/t Au from 780.7 m including 14.6 m @ 6.21 g/t Au (DDH1282). See the VRIFY link for visual representation of the results.

Follow-up drilling is ongoing with two additional holes to be completed by the end of the year for a total of 1,800 m.

Figure 3: Plan map showing 2025 drill hole locations. (CNW Group/OceanaGold Corporation)

Table 1: Haile drill intersections subsequent to the February 24, 2025, drill results update.


Hole ID

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Target

Activity


DDH1278

NSR

Ledbetter 04

Conversion


DDH1279

489.1

519.2

28.9

18.33

Ledbetter 04

Conversion


Including

505.5

506.8

1.3

189.22

Ledbetter 04

Conversion


DDW1280

NSR

Ledbetter 04

Conversion


DDH1281

375.9

384.5

8.7

22.30

Ledbetter 04

Conversion


Including

375.9

380.9

5.0

35.86

Ledbetter 04

Conversion


UGD0079

197.2

206.4

9.1

2.49

Horseshoe

Conversion


And

275.5

276.9

1.4

12.14

Horseshoe

Conversion


UGD0080

207.6

213.5

5.9

3.56

Horseshoe

Conversion


UGD0081

NSR

Horseshoe

Conversion


UGD0082

274.3

290.3

16.1

16.33

Horseshoe

Conversion


UGD0083

NSR

Horseshoe

Conversion


UGD0084

235.6

250.2

14.6

10.33

Horseshoe

Conversion


Including

244.8

247.8

3.1

37.14

Horseshoe

Conversion


And

263.0

273.3

10.2

11.12

Horseshoe

Conversion


UGD0085

258.6

282.6

24.0

7.99

Horseshoe

Conversion


UGD0086

259.3

281.3

22.0

8.60

Horseshoe

Conversion


UGD0088

238.6

247.8

9.2

1.97

Horseshoe

Conversion


UGD0089

217.2

231.7

14.5

2.46

Horseshoe

Conversion


And

236.0

243.8

7.8

9.24

Horseshoe

Conversion


Including

242.7

243.4

0.7

42.60

Horseshoe

Conversion


UGD0090

NSR

Horseshoe

Conversion


UGD0091

NSR

Horseshoe

Conversion


UGD0092

NSR

Horseshoe

Conversion


UGD0093

NSR

Horseshoe

Conversion


UGD0094

NSR

Horseshoe

Definition


UGD0095

NSR

Horseshoe

Definition


UGD0096

NSR

Horseshoe

Definition


UGD0097

271.0

278.6

7.6

3.63

Horseshoe

Definition


And

299.9

309.1

9.1

3.40

Horseshoe

Definition


UGD0098

NSR

Horseshoe

Definition


UGD0099

NSR

Horseshoe

Definition


UGD0100

267.9

272.9

5.0

5.64

Horseshoe

Definition


UGD0101

NSR

Horseshoe

Definition


UGD0102

NSR

Horseshoe

Definition


UGD0103

NSR

Horseshoe

Definition


DDH1271

647.0

654.6

7.6

10.39

Pisces

Initial Drilling


DDH1272

551.4

563.6

12.2

0.26

Pisces

Initial Drilling


DDH1274

607.5

609.0

1.5

3.21

Pisces

Initial Drilling


DDH1277

599.4

600.8

1.4

1.02

Pisces

Initial Drilling


DDH1285

522.3

529.8

7.5

1.79

Pisces

Initial Drilling


And

571.0

577.8

6.8

2.60

Pisces

Initial Drilling


DDH1286

627.7

632.0

4.3

0.57

Pisces

Initial Drilling


DDH1290

642.4

648.9

6.6

3.34

Pisces

Initial Drilling


DDH1293

536.2

543.4

7.2

2.56

Pisces

Initial Drilling


UGD0109

413.0

431.3

18.3

0.22

Pisces

Initial Drilling


DDH1276

400.5

406.6

6.1

2.30

Clydesdale

Initial Drilling


DDH1282

768.6

772.4

3.8

5.27

Clydesdale

Initial Drilling


DDH1282

780.7

806.9

26.2

4.11

Clydesdale

Initial Drilling


Including

792.2

806.9

14.6

6.21

Clydesdale

Initial Drilling












Notes:

  • Intervals are core length, not true width.
    "Initial Drilling" intercepts are associated with early-stage exploration drilling, "Definition" drilling intercepts are intercepts outside the current resource model shell directed at defining mineralization to an Inferred Resource category and "Conversion" drilling are intercepts converting Inferred Resources to Indicated Resources category. NSR = No Significant Result.

Table 2: Historical and OGC Haile drill intersections relevant to the Ledbetter 04, Pisces, and Clydesdale target areas.


Hole ID

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Target

Activity

DDH0436

NSR

Ledbetter 04

Initial Drilling

DDH0439

NSR

Ledbetter 04

Initial Drilling

DDH0450

NSR

Ledbetter 04

Initial Drilling

Investment Disclosure



The content provided on this website and in Mine$tockers episodes is for informational purposes only and should not be considered as an offer, solicitation, recommendation, or determination by Mine$tockers Inc. for the sale of any financial product or service or the suitability of an investment strategy for any investor.

Investors are advised to consult a financial professional to determine the appropriateness of an investment strategy based on their objectives, financial situation, investment horizon, and individual needs. This information is not intended to serve as financial, tax, legal, accounting, or other professional advice, as such advice should always be tailored to individual circumstances.

The products discussed herein are not insured by any government agency and carry risks, including the potential loss of the principal amount invested. Any information provided is based on both internal and external sources and should not be construed as an endorsement or conclusion regarding a company's financial prospects, resources, or management. Opinions expressed may change and should not be relied upon. It is crucial to seek personalized investment advice for your unique situation.

Natural resources investments are generally volatile, with higher headline risk than other sectors. They tend to be more sensitive to economic data, political and regulatory events, and underlying commodity prices. The prices of natural resources investments are influenced by factors such as the costs of underlying commodities like oil, gas, metals, and coal. These investments may trade on various exchanges and experience price fluctuations due to short-term demand, supply, and investment flows.

Natural resource investments often respond more sensitively to global events and economic data, including natural disasters, political turmoil, pandemics, or the release of employment data.

Investing in foreign markets may carry greater risks than domestic markets, including political, currency, economic, and market risks. It is essential to evaluate if trading in low-priced and international securities is appropriate for your circumstances and financial resources. Past performance does not guarantee future results.

Mine$tockers Inc., its affiliates, family, friends, employees, associates, and others may hold positions in the securities it covers. Some of the companies covered may be paying clients of the production.

No investment process is risk-free, and profitability is not guaranteed; investors may lose their entire investment. No investment strategy or risk management technique can guarantee returns or eliminate risk in any market environment. Diversification does not ensure a profit or protect against loss. Investing in foreign securities involves risks not associated with domestic investments, such as currency fluctuations, political and economic instability, and differing accounting standards, potentially leading to greater share price volatility. The prices of small- and mid-cap company stocks generally experience higher volatility than large-company stocks and may involve higher risks. Smaller companies may lack the management expertise, financial resources, product diversification, and competitive strengths needed to withstand adverse economic conditions.

logo

Studio


Toronto Ontario Canada

Email


kevin@MineStockers.com

Phone


+1 (905) 967-2519
















































Mining Articles















Copyright © MineStockers 2020

Copyright © The Mine$tockers Inc. 2020